The new filling hall of the brewery Kühler Krug requires a reliable supply of industrial process heat and process cooling. We supplied the required plant technology and set up a steam generator and a refrigeration plant.
- Setting up an oil-fired steam generator
- Setting up a refrigeration system (glycol cold water system)
- Switch cabinet construction for temperature measurement and control
- Plant construction Supply networks (steam, condensate and cooling lines)
Industry
Beverage technology
Location
Karlsbad, Germany
Project duration
3 months